Laserfiche WebLink
CIRCES Cost Estimating Software <br />MFMT MOBILIZATION / DEMOBIL12 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 088 State :Colorado <br />Date :0211612010 <br />User : GRM <br />County :Montrose <br />Site : Spring Creek Pit <br />Permit or other job action :Final Reclamation Liabilty Estimate Am-03 <br />Task description :mobilization to site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NUM-KUAUrac LG CV[U1r1V1"J <br />Machine <br />Description <br />-Cat D9R - 9U (2005) - <br />Weight/unit <br />(Tons) <br />67.38 <br />Ownership <br />Cost/hr/unit <br />$58.16 <br />Haul Rig <br />Cost/hr/unit <br />$125.45 <br />Fleet Size <br />(No. units) <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$183.61 <br />Return Trip <br />Cost/hr/fleet <br />$125.45 - <br />DOT permit <br />Cost/fleet <br />$0.00 <br />-Cat 633E Series 2 (2001) <br />-CAT 938G (2003) <br />-reveg equipment 56.34 <br />14.45 <br />10.00 $80.67 <br />$22.39 <br />$25.00 $125.45 <br />$88.67 <br />$88.67 2 <br />1 <br />1 $412.23 <br />$111.06 <br />$113.67 $250.90 <br />$88.67 <br />$88.67 $0.00 <br />$0.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $820.57 $553.69 $0.00 <br />N <br />sheet 1 of 2 <br />Permit/job #:M-1994-097 <br />Abbreviation :none <br />Filename :M097-08a