My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-17_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2010-02-17_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:04 PM
Creation date
2/22/2010 7:50:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
REVISION
Doc Date
2/17/2010
Doc Name
EPP, Adequacy Response
From
DRMS
To
Denison Mines (USA) Corp.
Type & Sequence
AM3
Email Name
RCO
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The site maps depict acceptable liner locations. All are shown to be 100 ft x 100 ft, a standard size which comports <br />with the written description. The exception is at the St. Jude Mine, as depicted in Figure 2-2, which shows a 50 ft x <br />200 ft liner. This does not match the 50 ft x 100 ft description included in the narrative. Please clarify. <br />Geotextile Material: The Division and Denison agree that due to the inherent limitations of the onsite soil for use as a <br />soil liner, an impermeable geo-membrane is required. Denison has proposed using a 30-mil PVC liner, but the <br />Division recommends that PVC not be used, since there is evidence that can degrade fairly fast, even when covered. <br />The Division suggests that an LLDPE membrane be used. Even when exposed to ultraviolet light, LLDPE has a <br />functional life of about 12 years before it starts to degrade. Since the liner will be used in an area where ore is stored <br />in piles less than 15 feet in height and which has low potential for runoff, a 30-mil LLDPE liner membrane represents <br />the minimum acceptable thickness. Please forward the appropriate specifications for this different liner material. <br />Installation: The Division generally accepts Denison's proposed plan. To clarify and/or reiterate, the following <br />comments are included herein. Surface preparation prior to liner deployment will include the placement, grading and <br />compaction of the soil substrate such that it produces a smooth surface on which to bed the liner. The soil substrate <br />should be screened, placed, and compacted as proposed. The compaction of the soil substrate should be tested once for <br />every ore pad liner installed to verify adequate compaction of material (per manufacturer's liner requirements). All <br />bedding material will be visually inspected prior to liner deployment, and all particles larger than 3/8 inch, or other <br />angular or protruding materials, must be removed to maintain integrity of the liner. The anchor trench along the <br />perimeter of each geo-membrane must be a minimum of 1 foot deep and 1 foot wide; 2 feet deep and 2 feet wide is <br />preferable. A perimeter berm must be included to prevent runoff and runon, yet must be traversable by equipment and <br />not allow damage to the liner. The anchor trench should be located at least a foot outside the crest of the berm. Trench <br />backfill materials must be adequately compacted. The liner cannot be deployed when temperatures are below 35 <br />degrees F, or when there is precipitation (or per manufacturer's recommendations, whichever is more conservative). <br />Liner material will be covered to a depth of at least 1 foot of clean and screened earthen fill, to be placed and spread as <br />proposed. All preparation and installation must proceed according to the approved plan, and overseen and documented <br />by qualified onsite QC monitor, who, per Hard Rock/Metals Rules, must be a Colorado registered PE. <br />Testing and Certification: All liner deployment QA/QC will include trial seam testing, field seam testing (pressure <br />testing), and destructive testing (at a location selected by the QC monitor). Destructive testing of the field seamed geo- <br />membrane will be approximately 24 inches along the seam and 12 inches across the seam, one sample each day or <br />every 500 feet along the seams. <br />Agreement by Operator: After questions and issues have been addressed, written agreement to the final plan and <br />design is required from the operator. Upon receiving the operator's agreement, the Division will prepare any final QC <br />specifications and standards for uranium ore storage, in a formal memo to the operator. DRMS will also issue its <br />written approval of the design and plan. <br />Please respond to the above items within 30 days of the date of this letter, by sending two sets of response materials <br />directly to me at the Division's Durango field office: 691 CR 233, Room A-2, Durango, CO 81301. If there are any <br />questions you may send them to me at the same address. <br />Sincerely, <br />6t 1Bob Oswald <br />Environmental Protection Specialist <br />Encl: memo