Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 52 <br />Task description : Regrade Light Use Roads <br />:::: .......................................................................................................................................................... <br />HOURLY E ................................... <br />QUIPMENT COST <br />Basic machine : Cat D91? - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br /> <br /> <br />.......... <br />MATERIAL.... QUANTITIES <br />Q.UANTITIES <br /> <br />................................................... <br /> <br />........................................................ <br />.............. <br />.. <br /> <br /> <br />.............................. <br /> <br /> <br />.................... . <br />Initial Swell Loose <br />volume : 44,000 8 CY factor : 1.250 volume : 55,000 LCY <br /> <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />_ ................_... <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />;;;,........................... <br />«".Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.35 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 319.91 LCY/hr <br /> Adjusted fleet production : 319.91 LCY/hr <br /> <br />JOB TIME AND COST ::::::................ ................................................... ....................................................................... ............................... .. <br />.......................... <br />Fleet size : 1 Dozer(s) Total job time : 171.92 Hours <br />Unit cost : $0.649 /LCY Total job cost : $35,680