My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2008-02-22_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:13 PM
Creation date
2/18/2010 8:59:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
2/22/2008
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />ED <br />INTEROFFICE <br />MEMORANDUM <br />TO: Joe Dudash <br />FROM: Jim Sta <br />SUBJECT: Bowie No. 2 Mine's TR-52 Cost Estimate <br />DATE: 22 February 2008 <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Attached is the reclamation cost estimate for the Bowie No. 2 Mine's Technical Revision <br />52 - the drilling of 13 gob vent boreholes. The estimate is nine tasks (a summary sheet <br />and task 271-278) and represents an increase in liability of $273,624.00. <br />The Division's estimate is approximately $75,000 more than the estimate submitted by <br />BRL. The main reason for the higher Division estimate is the earthwork costs (dozer <br />tasks 272-275). BRL estimates the earthwork costs at approximately $14,000.00, while <br />the Division estimates the same cost at approximately $93,000.00. In their estimate, BRL <br />uses a generalized cost of $90.00/hour for the equipment and a generalized time of 4 <br />hours/pad for reclamation. The Division estimates the quantity of dirt moved and the <br />variables (adjustment factors) that go into the tasks. Additionally, there does not appear <br />to be a cost for topsoil replacement in the BRL estimate, which accounts for <br />approximately $28,000.00 of the earthwork costs. <br />This estimate also includes a credit for gob vent borehole GVB-6F, which was not <br />drilled. This credit amounted to approximately $12,000.00. The credit is based on the <br />estimated cost from Minor Revision 78. <br />Please let me know if you have any questions or need any additional information. <br />cc: Sandy Brown w/out attachments <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.