My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981018 (32)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
_INSPECTION - C1981018 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 12:48:35 PM
Creation date
2/17/2010 12:49:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
2/10/2010
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial coal inspection conducted by Jason Musick of the Colorado Division of <br /> Reclamation, Mining, and Safety (Division) on 10 February 2010. The weather was clear and the <br /> mine site was snow covered during the on-the-ground inspection. Scott Wanstedt of BME <br /> accompanied the inspection and Rob Zubak of DRMS. <br /> The mine is currently operating as permitted. No drilling activities were in progress during the <br /> inspection. Deserado Mine continues to longwall in panel 10. <br /> Signs and Markers <br /> BME has submitted a proposal of BMEs compliance of 4.02 in reference to perimeter area markers <br /> for the Divisions review. The Division is in process of reviewing BMEs proposal at the time of this <br /> inspection. <br /> Roads <br /> The haul road was clear of snow and stable at the time of the inspection. Access roads in and around <br /> the facilities area, conveyor and the refuse disposal area were snow covered and stable. Roadside <br /> ditches were snow covered at the time of the inspection with no problems noted. <br /> Hydrologic Balance <br /> DP-1 pond was snow covered at the time of the inspection. The embankments were stable and snow <br /> covered at the time of the inspection. The principal and emergency spillways were stable and in <br /> compliance at the time of the inspection. No discharge was noted. <br /> PP-1 and PP-2 ponds were iced over and snow-covered at the time of the inspection. Embankments <br /> were snow covered and stable. No problems were noted. <br /> SS-1 and SS-2 ponds were snow covered at the time of the inspection. Embankments were stable <br /> and snow covered and spillways were in compliance with no problems noted. <br /> Ponds RP-2/3, 4, and 5 were snow covered with no ice noted. Embankments were snow covered <br /> and stable with o identifiable compliance issues noted. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.