My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-16_HYDROLOGY - C1981014
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2010-02-16_HYDROLOGY - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:36 PM
Creation date
2/16/2010 3:54:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
HYDROLOGY
Doc Date
2/16/2010
Doc Name
3rd Quarter 2009 Pond Inspections
From
Peak Project Management
To
Engery Fuels Coal
Permit Index Doc Type
Sediment Pond Inspect
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: Southfield <br />NPDES ID. No.: Pond #5 <br />Inspection Period: Third Quarter 2009 <br />Inspection Date: October 20, 2009 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies north east of the main facilities area. All drainage from the <br />reclaimed mine facilities area is directed to this pond. The primary discharge gate has been disabled <br />in the open position, ensuring that the pond functions as a "pass-through" facility. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />Excellent oderat Few Poor <br />Extensive Some ew None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />Yes No L <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />• Evaluate the severity: Extensive Moderate <br />Page 1 of 2 <br />Yes No (-' <br />Yes No !i' <br />Yes lr <br />Yes <br />Yes ?G <br />Yes <br />Just starting <br />No <br />No <br />No _ <br />No <br />None
The URL can be used to link to this page
Your browser does not support the video tag.