My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-11_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2010-02-11_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:31 PM
Creation date
2/16/2010 11:20:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
2/11/2010
Doc Name
2nd Adequacy Review Letter
From
DRMS
To
Peabody Energy Corporation
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Vern Pfannenstiel <br />February 11, 2010 <br />16. Please add to the permit application the following historic reclamation information <br />pertaining to the Seneca II lands that will be transferred to the PSCM: <br />(Responses to items a and b of this Comment 16 are adequate as submitted.) <br />c) A summary of past husbandry practices; <br />i. Weed control measures; method-chemical, biological, or mechanical, <br />describe, and what species was being controlled. Although the weed <br />management plan provided says what will be done if weeds are found, the <br />history of weed control measures previously employed are needed. <br />ii. (This response is adequate as submitted.) <br />iii. Mowing, location and dates (year would be adequate, for example: <br />Mowed parcel 89-2 in 2001). This information is needed because <br />mowing can be used as a weed control measure. <br />48. Please revise the calculation of ground water flow velocity on page 2.04-52 using a <br />value for porosity that is significantly less than 14% (we suggest a value of 10%), <br />and revise associated analyses or references in the permit application. Although <br />Robson and Stewart reported 14% as an average and used it in their numerical <br />simulation, it represents total porosity, rather than the effective porosity value that is <br />required in a calculation of Darcy seepage velocity. SCCC's bulk density logs show <br />that total porosity of the beds in the underburden (the only interval logged) that are <br />most likely to be permeable (sandstone) are around 15%, but the low hydraulic <br />conductivity values shown for the lower member of the Williams Fork in Table <br />2.04.7-T2 indicate effective porosity would be significantly less than the total <br />porosity shown on the logs. Based on Williams and Clark's (1992) study, it is <br />probable that clay minerals reduce effective porosity to a value that is significantly <br />less than total porosity. Their mineralogic analysis (Table 15) found that core <br />samples from the lower member of the Williams Fork contained abundant clay <br />minerals (mainly kaolinite). Their comparison of hydraulic conductivity and <br />permeability to air (page 23 of their report) concluded that permeability was reduced <br />to less than the theoretical maximum probably as a result of clay minerals plugging <br />the sandstone pores. Although Williams and Clark's data may suggest effective <br />porosity would be only a fraction of the value of total porosity, they analyzed <br />permeameter samples which would not have had fracture porosity; therefore, an <br />effective porosity value of 10% is suggested relative to total porosity of 14% or 15%, <br />rather than some smaller effective porosity value. <br />49. Please revise the calculation of mine water discharge to alluvium at the top of page <br />2.05-85 so that it uses the 2.5 ft/day hydraulic conductivity value noted above in our <br />Comment 14. <br />50. Please revise the mine inflow and drawdown calculations in Section 2.05.6(3)(b)(iii) <br />as follows: <br />Page 4 <br />a) Extend the time period to include the end of the first 60-month permit term and <br />30 years after the end of the 60-month permit term.
The URL can be used to link to this page
Your browser does not support the video tag.