TABLE 49A
<br /> Soil Stockpile Summary
<br /> STOCKPILE ID CURRENT VOLUME VOLUME TO BE ADDED TOTAL VOLUME
<br /> III
<br /> (CY) (CY) (CY)
<br /> FCB -1 7,400 0 7,400
<br /> FCB -2 350 0 350
<br /> FCB -3 _ 170 0 170 -
<br /> FCVF -1 345 0 345
<br /> SSS -1 1,980 0 1,980
<br /> RDT -1 810 0 810
<br /> WWTF -1 4,000 _ 0 _ 4,000
<br /> • SF -1 54,840 0 54,840 -
<br /> . SF -2 _ 55,860 0 55,860 _
<br /> SF -3 109,410 295 109,705
<br /> SF -4 3,635 0 3,635 _
<br /> SF -5 700 1,450 2,150
<br /> SF -6 96,540 445 96,985
<br /> SF -7 38,700 0 38,700
<br /> . SF -8 4,100 0 4,100
<br /> SF -9 5,800 0 5,800
<br /> SF -10 325 0 325
<br /> SF -11 100 - 0 - 100 _
<br /> PPSP -1 6,300 120 6,420
<br /> PPSP -2 4,170 0 4,170
<br /> SF- 12,13,14 (1) 154,880 0 154,880
<br /> SF -15 0 805 805
<br /> SF -16 0 2,200 2,200
<br /> SF -17 0 890 890
<br /> CRDA -1 A -C 0 233,590 233,590
<br /> . TOTAL 550,415 239,795 790,210
<br /> EASTERN MINING DISTRICT
<br /> -
<br /> Dewatering Borehole 7,225 0 7,225
<br /> Dewatering Treatment Pond 0 6,295 6,295
<br /> (includes access road)
<br /> Ventilation Site 4,765 0 4,765
<br /> # 7 North Escape Shaft 2,220 0 2,220
<br /> TOTAL 14,210 6,295 20505
<br /> NORTHERN MINING DISTRICT
<br /> Power Borehole 0 5,700 5,700
<br /> Ventilation Shaft & Road 0 2,550 2,550
<br /> 1 8Rt Shaft & Road 0 _ 6,600 6,600
<br /> 6MN Shaft, Road, & 0 23,700 23,700
<br /> Reservoir _
<br /> TOTAL 0 38,550 38,550
<br /> WESTERN MINING DISTRICT
<br /> STOCKPILE ID CURRENT VOLUME VOLUME TO BE ADDED TOTAL VOLUME
<br /> (CY) (CY) (CY)
<br /> 18Lft Shaft & Road 0 13,550 13,550
<br /> TOTAL 0 13,550 13,550
<br /> (1) The volume listed for SF -12, 13, and 14 is split between the three stockpiles, as shown on Map 29
<br /> (2) The volume listed for the 18Rt Shaft and Roads is split among four stockpiles, with volumes being split roughly
<br /> 40/30/15/15 percent beginning at the shaft pad and running back along the access road to the stock -pond location. Stockpile
<br /> • locations are shown in Exhibit 8S.
<br /> (3) The volume listed for the 6MN Shaft, Roads, and Reservoir is split among four stockpiles, with volumes being split roughly
<br /> 40/30/15/15 percent, beginning at the shaft pad stockpile and running back along the access road to the NW Mains Vent
<br /> Shaft. Stockpile locations are shown on Map EXI6E -M1.
<br /> TR09 -67 10/12/09