Laserfiche WebLink
MR 97-147 - SI'l)KI;R "f12UCh LOAUOUT FAN BUILDING ANU 12 P:"PAINING WALLS <br />• I Ian Building <br />concrete: I5' s I ~~ = 331 sf a $3.15/sf = $ 709.0(1 <br />building: 15 ' s I S ~ 12' = 2,700 cf (c~ I SUcf = $ 486.011 <br />Total Building Removal = $ 1,195.00 <br />II. MCC & F.tn Building Retaining Wall <br />steel piles/wood cribs: 40' ~ 8~ = 320sf ~ $1.25/sf = $ 400.00 <br />III. Transfer Building Retaining Wall <br />steel piles/wood cribs: 40' s 12' = 480sf x $1.25/sf = $ 600.00 <br />Subtotal = $ 2,195.00 <br />Admin (17%) _ $ 373.00 <br />Total Reclamation cos[ for MR 97-147 = $ 2,568.00 <br />• <br />• <br />MR 97- 154 76 I Oi2197 <br />