Laserfiche WebLink
- MR 98-159 -TRAINING FACILITY, WATER LINE. and TELEPHONE PO LE & <br /> CABLE ADDITION <br /> ~G~ <br />I. Trtining Facility ~~'~'~ ~ ~ ' "•, , 7~ ~ o <br /> Concrete for footer (8"x16°x2161f), foundation malls (8"xTx2161f), pier pads 6(3'x3'x10"): <br /> 45.78 CY p 55.18/CY = $237.00 <br /> Building (trailer): 61' x 28' x 12' = 20,496 cf ®18C/cf = $3,689.00 <br /> Walkwsy (wood): (5' x 40' x 4') + (5' x 20' x 4') + (3' x 5' x 4') + (3' x 20' x 5'): <br /> 1,560cf ©18C/cf $281.00 <br /> Total Building Removal = $4,207.00 <br /> II. Water Line <br /> 2 hydrants: 2 (4.5' x 2) ~ $4.72/lf = $85.00 <br /> Total Water Line Removal = $85.00 <br /> III. Telephone Pole & Cable Addition <br /> Cable distance (figure includes poles): 4400 If ~ $1.88/If = $8,272.00 <br /> Total Telephone Pole and Cable Removal = 88,272.00 <br />• <br /> Subtotal = 512,564.00 <br /> Admire (17% of subtotal) _ $2,136.00 <br /> Total Reclamation Costs for MR 98-159 = $14,700.00 <br /> <br /> MR 98-159 79 6/11/98 <br />APPROVED JUL o 2 1998 <br />