Colowyo C-1981-019 <br /> 28 Jan 10 <br /> Pg 3/3 <br /> Backfilling and Grading (cont.): - Colowyo was working on backfilling the 2010 area <br /> of the East Pit (although the operations were down at the time of the inspection for <br /> routine maintenance). They are pushing material on the south side of the 2009 <br /> reclamation area, by the North Tributary, East Pit Ditch. The reclamation that was <br /> completed in the summer of 2009 was covered with snow. The south portion of that <br /> reclamation block appeared to have very deep snow. The prevailing wind at the <br /> mine is from the southwest so it appears as though the snow is blowing in from the <br /> South Taylor Pit area and above and being deposited on the reclamation. Colowyo <br /> will need to watch this area closely during spring snowmelt/runoff to ensure the <br /> reclamation remains stable. <br /> - The West Pit area that was backfilled, topsoiled and seeded in the summer of 2009 <br /> was observed from above (on the east side). The area appeared to remain stable. <br /> This area has received a fair amount of snow, with some melting off in the previous <br /> months. No problems were noted on this portion of the backfill at the time of the <br /> inspection. All of the runoff from this area will flow into the series of contour ditches, <br /> into the Taylor Tributary Ditch and finally into the East Taylor Pond. <br /> General Mine Plan Compliance: - The 101 dragline was back on the edge of the East <br /> Pit highwall. No additional reclamation has been completed on the East Pit highwall <br /> and Colowyo has shut off power to the 101 . <br /> - The 102 dragline was down for scheduled maintenance but has been performing <br /> backfilling operations in the Taylor Draw. Please see the "Backfilling and Grading" <br /> section for more detail. <br /> - The 103 dragline was also down for scheduled maintenance but has been working <br /> in the West Pit removing overburden. <br /> - The 114 shovel operation was down for scheduled maintenance but was sitting in <br /> the South Taylor Pit box-cut, where it is removing B-Seam overburden. <br /> Excess Spoil: - The C-C' underdrain area of the East Taylor is still active, but Colowyo <br /> has not used the area as a dump for the last several months. Colowyo is working on <br /> the fifth lift and is above the pile's final approved topography. Colowyo will use this <br /> area as a temporary overburden stockpile and will return all of the material above <br /> the approved final topography to the South Taylor Pit. <br /> - Colowyo is also using the B-B' underdrain area of the West Taylor Fill for excess spoil <br /> placement, although the majority of the overburden material has been going to the <br /> Section 16 Pit final cut area for the past two months. Colowyo is working on the <br /> second lift of the fill at this time. They have moved down towards the toe (and the <br /> West Taylor Pond) but remain at least 600 feet from the final toe. No overburden <br /> material has been placed up gradient from this area into the A-A' underdrain. <br /> - Colowyo has submitted Technical Revision 81 to the Division. This revision proposes <br /> to change the volume and configuration of the East Taylor Fill, the West Taylor Fill and <br /> the temporary overburden stockpiles. This revision was deemed complete on 28 <br /> December 2009 and is currently under review by the Division. <br /> This completes the 28 January 2010 inspection report for the Colowyo Mine. <br />