My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-04_GENERAL DOCUMENTS - M1999058
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1999058
>
2010-02-04_GENERAL DOCUMENTS - M1999058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:17 PM
Creation date
2/9/2010 1:26:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/4/2010
Doc Name
Notice of closing operations for the winter
From
Polycor Georgia Marble
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />POLYCOR GEORGIA MARBLE <br />GEORGIA ARCHITECTURAL STONE I GEORGIA STONE QUARRIES I COLORADO STONE QUARRIES <br />PO. Box 238, Tate, GA 30177 U.S.A.1 Phone (770) 735-261 1 I 1 800 334-0122 I Fax (770) 735-2236 1 www.polycorcom <br />RE(;s-ED <br />January 28, 2010 <br />FEB 09 2010 <br />Division of rteciamation, <br />dining and Safety <br />Mr. Russ Means <br />State of Colorado <br />Department of Natural Resources <br />Division of Reclamation, Mining & Safety <br />101 South 3`d, Suite 301 <br />Grand Junction, CO 81501 <br />RE: COLORADO YULE QUARRY UPDATE <br />M- 1019cl -050 <br />Dear Mr. Means: <br />!VEE <br />FEb042010 <br />GRAiVO,,z OFFICE <br />a} OF <br />RECIJdkIAT, ?s'??; aI1F:Cz 3 E'AFETY <br />Colorado Stone Quarries will be closing operations for the winter months. At this time, we view this as a <br />temporary closing, hopefully not to exceed 180 days. <br />As spring approaches, we will probably be performing water discharge and visual reclamation <br />inspections (i.e. dewatering sumps, boundaries, etc.). The engineering plans to comply with the <br />Reclamation Board order will be finalized and submitted. <br />I understand that currently I am the official contact of record. Should a change be made, your office will <br />be notified. <br />I have reviewed the Construction Materials Rules & Regulations, Section 1.13.5, as located on your <br />website (www.state.co.us). <br />We look forward to working with you this summer in the completion of our engineered containment <br />area. <br />Sincerely, <br />Francois Darmayan <br />Vice President, Quarries Division
The URL can be used to link to this page
Your browser does not support the video tag.