Laserfiche WebLink
'jx <br />of.?nnnDr C Cni IrDR.A MT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 15K GVW $48.51 1 $48.51 $48.51 <br />-Light Duty Pickup, 4x4, 314 T. $32.61 1 $32.61 $32.61 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $81.12 $81.12 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Criag <br />Transportation Cycle Time : Non- Total one-way travel distance : 2.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.06 0.06 Total non-roadable mob/demob cost $648.63 <br />Return time (hours) = 0.06 0.06 " two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost'`' : $9.27 <br />Unloading time (hours) = 0.50 NA -k one round trip, no haul rig <br />Subtotals = 1.11 0.11 <br />JOB TIME AND COST Total job time : 2.23 hours <br /> Total job cost : $658