Laserfiche WebLink
Union Pacific Railroad (formerly Southern Pacificl <br />• The monitoring of Foidel and Middle Creeks has been described previously in [he hydrologic monitoring plan <br />(see Exhibit 14). <br />Foidel and Middle Creeks <br />Foidel Creek, Middle Creek, Fish Creek, and Fish Creek's alluvial valley floor(s) will be monitored as per the <br />proposal presented in the hydrologic monitoring plan. Additionally, the creeks will be surveyed before and after <br />longwall mining to prepare a channel profile. The profiles will be compared to determine if there are any <br />r1 <br />U <br /> <br />APPROVED nPR 2 a 19B <br />PR 97-04 2.05-191.3 04/ l 5/98 <br />