Laserfiche WebLink
Mine Identification - DMG Permit No. C 82-056 <br />MSHA ID No. -05-03836; Issued 1983 <br />Violation Identification: CV -2007-004, August 24, 2007 <br />Issuing _Regulatory Authority: Division of Reclamation, Mining, and Safety <br />Brief Description of Violation: Failure to conduct mining operations in accordance with permitted plans, <br />specifically, un-permitted disturbance of the surface, augering of geotechnical test holes, and excavation of <br />geotechnical test pits for the proposed 6MN Mine Water Storage Reservoir. <br />Date, Location and Type of Administrative Proceedings_ Notice of Proposed Assessment issued on September 20, <br />2007 for a proposed civil penalty of $900.00. A Notice and Order to Pay Fixed Penalty was issued October 11, <br />2007, and payment was submitted on October 15, 2007. <br />Current Status: NOV terminated on September 20, 2007. <br />Actions Taken to Abate Violation: The minimal surface disturbance associated with the site geotechnical <br />investigations was reclaimed immediately following completion of soil augering and test pit excavation. A <br />Technical Revision application (TR07-62), addressing permitting of the geotechnical investigations, was <br />submitted on September 4 2007, and subsequently approved on February 4, 2008. <br />Final Resolution: The NOV was terminated on September 20, 2007, and TCC submitted payment for the <br />$900.00 civil penalty on October 15, 2007. <br />Mine Identification - DMG Permit No. C 82-056 <br />MSHA ID No. -05-03836; Issued 1983 <br />Violation Identification: CV -2006-004, September 5, 2006 <br />Issuing Regulatory Authority: Division of Reclamation, Mining, and Safety <br />Brief Description of Violation: Failure to dispose of coal fines in accordance with the approved permit. Failure to <br />minimize disturbance to the prevailing hydrologic balance. Failure to maintain Sedimentation Pond E so as to <br />provide adequate runoff capacity for the 10-year, 24-hour precipitation event. Failure to prevent an unapproved <br />disturbance within 100 feet of an intermittent stream. - Rupture in buried washplant thickener underflow line caused <br />coal fines slurry to flow to and partially fill Sedimentation Pond E, resulting in coal fines discharge to Foidel Creek. <br />Date, Location and Type of Administrative Proceedings: Notice of Proposed Assessment issued on October 17, <br />2006 for a proposed civil penalty of $2,050.00. A Notice and Order to Pay Fixed Penalty was issued September 19, <br />2006. TCC submitted a request for an Assessment Conference on October 26, 2006, and worked with the CDRMS <br />on scheduling of the Assessment Conference consistent with the Abatement schedule. Given time and weather <br />constraints, and the desire to address all abatement requirements in a timely manner, TCC and the CDRMS jointly <br />agreed to forego the Assessment Conference, and payment was submitted on December 19, 2006. <br />Current Status: Abatement Steps 1-11 were completed on or before the scheduled abatement dates. NOV <br />terminated on February 9, 2007. <br />Actions Taken to Abate Violation: On discovery of the coal fines discharge (09/11/06), TCC took immediate steps <br />to cease discharge, contain the discharged material, assess downstream migration of coal fines, and contact <br />appropriate agencies. Consultation with the agencies resulted in development of an 11-Step Abatement Plan: <br />Step 1 - Cease discharge (Abatement date 09/13/06 - Completed 09/11/06 - Abated 09/13/06) <br />Step 2 - Repair the broken thickener underflow line (Abatement date 09/13/06 - Completed 09/11/06 - <br />Abated 09/13/06) <br />Step 3 - Perform immediate damage control activities for Foidel Creek (Abatement date 09/13/06 - <br />Completed 09/11/06 - Abated 09/13/06) <br />Step 4 - Notify CDPHE-WQCD, CDOW, and USACE (Abatement date 09/13/06 - Completed 09/12/06 - <br />Abated 09/13/06) <br />Step 5 - Notify downstream water owners/users (Abatement date 09/29/06 - Completed 09/19/06 (phone <br />contact) with follow-up letter on 09/19/06 - Abated 09/22/06) <br />Step 6a - Assess Pond E discharge (Abatement date 10/13/06 - Completed 10/13/06 - Abated 10/13/06) <br />Step 6b - Assess receiving water quality (Abatement date 10/10/06 - Completed 10/10/06 - Abated <br />10/10/06) <br />Step 6c - Contain the coal fines discharge (Abatement date 10/03/06 - Completed 09/11/06 - Abated <br />09/13/06) <br />Step 6d - Assess potential toxicity impacts (Abatement date 10/03/06 - Completed 09/12/06 - Abated <br />10/03/06) <br />TR09-68 2.03-20 07/06/09