My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-05_REVISION - C1996083 (8)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-02-05_REVISION - C1996083 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:21 PM
Creation date
2/9/2010 9:13:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
2/5/2010
Doc Name
Adequacy Response No. 1
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
TR65
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.6 <br />(3)(b)(iv) <br />Hydrologic Monitoring Plan <br />The following monitoring plan is designed to provide data which will verify the <br />Bowie No. 2 Mine will not have significant adverse impacts on the surface or <br />subsurface water which is within or adjacent to the permit area. The hydrologic <br />monitoring locations, shown on Map 9 are: <br />Springs will be monitored quarterly. Depending on weather conditions, the first <br />quarter monitoring event may be delayed until April or May. Field parameters will <br />be measured each quarter and a full suite sample will be obtained each quarter <br />from all springs which have a flow of five gallons per minute or more. Spring <br />monitoring will include water right map codes 1 through 5 which are decreed <br />water rights described as J & M Spring & PL No. 1 - 5. J & M Spring & PL No. 1 - <br />4 are on the Applicants land and are owned by the Applicant. <br />Stock Ponds will be monitored quarterly. Depending on weather conditions, the <br />first quarter monitoring event may be delayed until April or May. The following <br />• information will be collected for the ponds; 1) inflow; 2) outflow; and 3) water level <br />below spillway outlet or depth of water in pond measured from the bottom of the <br />pond. <br />The following fourteen drill holes will be monitored: DH-15, DH-25, DH-38, DH- <br />39, DH-49, DH-65, DH-67B, DH-67D, DH-67Abv, DH-67BIw, TC-03-01(B), TC- <br />03-01(R), TC-03-02, TC-03-03, 2010-1. Depending on weather conditions, the <br />first quarter monitoring event may be delayed until April or May. Field parameters <br />will be measured each quarter. A full suite sample will be obtained semi-annually <br />during the second and fourth quarters. <br />The Deer Trail Ditch will be monitored at the designated upstream and <br />downstream monitoring locations (designated ADTD@ on Map 9). Field <br />parameters will be measured each quarter. A full suite sample from List 1 will be <br />obtained semi-annually during the second and fourth quarters. During August of <br />each year a sample will be obtained and analyzed for the parameters on List 2. <br />r? <br />TR-65 2.05 - 76 02/10
The URL can be used to link to this page
Your browser does not support the video tag.