My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-05_PERMIT FILE - M2009086
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009086
>
2010-02-05_PERMIT FILE - M2009086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:20 PM
Creation date
2/9/2010 8:11:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009086
IBM Index Class Name
PERMIT FILE
Doc Date
2/5/2010
Doc Name
Adequacy response
From
Flintstone Gravel & Trucking, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
batch plant and the needed stockpiles of material and equipment to operate the <br />business we will be removing all topsoil and overburden from both the west and <br />east halves of the permitted area. However, no mining will take place on the east <br />one-half of the area during Phase I-A. This area will only be stripped and used for <br />the asphalt batch plant, material stockpiles and storage. Once the mining has <br />depleted all the materials from Phase I-A at a depth of 20' we will then move our <br />mining to the east into Phase 1-B. Phase I-B will consist of 7.5 acres. Should an <br />asphalt plant be operational at that time it will be necessary for them to move to the <br />west and relocate the batch plant and stockpiles. Once Phase I-B has been <br />completed we will then move the Phase II Phase II will consist of 15 acres. <br />Mining would begin back at the west side of the area and proceed mining in the <br />same manner as before with an additional 20' in depth or three feet above ground <br />water, whichever is less. <br />e. Proposed mining will begin in the spring of 2010 and is estimated to <br />continue for 15+ years . Depending on the demand for product it is estimated that <br />approximately 1 acre per year would be mined after the initial year which we <br />project to mine approximately 5 acres. The beginning elevation of the pit is <br />approximately 8150 and mining will take place in three stages to reach the final <br />elevation projected which is 8110. The first stage will begin in Phase I-A and go <br />to a depth of 8130. Once the entire portion of Phase I-A has been mined to that <br />elevation Phase 1-13 will proceed to the same elevation. Upon completion of <br />mining in Phases I- A and I-B the last Phase II will lower the elevation of the entire <br />area to approximately 8110. Once all stockpiles of material are depleted in Phase <br />I-A and I-B and the mining and stockpiling has progressed to Phase II those areas <br />of the pit that can be reclaimed will be. <br />PHASE I Mining Stripped <br />Year Elevation Disturbed <br />Acres Disturbed <br />Acres Reclaimed Acres <br />I-A <br />2010 8150 5.0 10.0 <br />2011 8130 6.5 8.5 <br />2012 8130 7.5 7.5 <br /> <br />Revised 02/04/10