My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-08_REVISION - M1974070
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974070
>
2010-02-08_REVISION - M1974070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2025 1:19:02 PM
Creation date
2/9/2010 7:36:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974070
IBM Index Class Name
REVISION
Doc Date
2/8/2010
Doc Name
Adequacy Review #1
From
DRMS
To
Lafarge West, Inc.
Type & Sequence
TR3
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />February 8th, 2010 <br />Anne Best Johnson <br />Lafarge West, Inc. <br />11409 Business Park Circle, Suite 200 <br />Longmont, Colorado 80504 <br />RE: Nelson Pit; M-1974-070: Technical Revision 03; Adequacy Review #1 <br />Dear Mrs. Johnson, <br />COLORADO <br />D I V I S I O N OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />James B. Martin <br />Executive Director <br />The Division received a Technical Revision (TR-03) on January 26th, 2010 submitted by Sean <br />Frisch with Lafarge West, Inc (Lafarge). According to Mr. Frisch, you are currently managing this <br />mine site. There are several issues that will need to be addressed prior to approval of the <br />Technical Revision. The decision date for the Technical Revision is February 25th, 2010. If the <br />decision date arrives and the issues discussed below are not addressed to the Division's <br />satisfaction it will be your responsibility to waive Lafarge's right to a 30 day processing period <br />for a Technical Revision and request an extension of the decision date. If the decision date <br />arrives and there are outstanding adequacy review issues, the Technical Revision will be denied. <br />Please keep in mind the Division will need time to review your response to this letter prior to <br />the decision date. <br />Item #1: Final Lake Configuration <br />1.) According to the narrative, there are five lakes located at the site. The map submitted with <br />the Revision displays eight lakes. Please clarify this discrepancy. <br />Item #2: Map <br />2.) The map submitted essentially is an updated Reclamation Plan Map, thus must conform to <br />the requirements of Rule 6.2.1 (2) and Rule 6.4.6. Please make the following corrections: <br />• Please portray the proposed land use for each portion of the affected lands. <br />o The post mine land use designated for this site is recreation. <br />o Indicate the areas that have been revegetated. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.