Laserfiche WebLink
EXHIBIT L <br />Reclamation Costs <br />Sikes Pit #2 <br />Per 1-Acre: <br />To replace 4" of overburden (537 cubic yards), 5 hours, at $150 an hour, with a <br />scraper, will be: <br />$750.00 <br />To replace 6" of topsoil (806 cubic yards), 6 %2 hours, at $150 an hour, with a <br />scraper, will be: <br />$975.00 <br />To rip area to be seeded, 1 hour, at $150 an hour will be: <br />$150.00 <br />Grass seed per acre: <br />$120.00 <br />Drilling grass seed, 1 hour, at $120 an hour will be: <br />$120.00 <br />Total Cost Per Acre: $2,115.00 <br />67 Acres at $2115.00 an Acre: $141,705.00 <br />Slope excavation of high walls to 3-1, 60 hours at $200 an hour, <br />with a dozer, will be: <br />$12,000.00 <br />Mobilization: $6,000.00 <br />Total for 67 Acres: $159,705.00 <br />Reclamation for 1 Acre: $2,383.65