Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 0113112007 <br />User: SLB <br />State : Colorado <br />County : Gunnison <br />Site : Bear No. 3 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis :-I per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume <br />Area : 8.64 acres Rip depth (ft) : 2.00 Volume <br />NA <br />27,878 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Map 10 <br />Source of estimated load factor : NA <br />.;:.;:.;:.;:.;:.:::.::: , ::.::.:::::.::::: .:::::::::: ,..:............................. . <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />NA feet/second <br />NA cu. yds./hour <br />2.00 feet/pass <br />6.50 feet/pass <br />200.00 feet/pass <br />88.00 feet/minute <br />6.25 minutes/pass <br />6.710 acres/hour <br />Unadjusted production : 2,290.29 cu. yds./hour <br />Unadjusted production <br />per selected method <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />Adjusted unit production <br />Adjusted fleet production <br />2,290.29 cu. yds./hour <br />6,000 feet <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />1,900.94 cu. yds./hour <br />1,900.94 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 14.67 hours <br />Unit cost : $0.073 per cu. yd. Total job cost : $2,037 <br />xxx <br />Permit/job # : C-1981-033 <br />Abbreviation : none <br />Filename : C033-004