My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-01_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2007-02-01_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:34 PM
Creation date
2/5/2010 9:43:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
2/1/2007
Doc Name
Adequacy Review- Reclamation Cost Estimate
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ADJUSTED COSTS ..... . <br />ownership Costs'' <br /> <br />Depreciation CFC Overhead <br />Overhaul and Operating Costs sheet 2 0 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $3.89 NA NA NA NA NA NA NA NA NA NA <br />Econ. life -Dozer and ROPS : $3.89 NA NA $3.90 $2.43 $4.76 $2.14 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.46 $0.28 $0.76 $0.35 NA NA NA NA <br />Annual usage : $6.40 $2.74 1 $3.35 NA NA NA NA NA NA NA NA <br />Double shifts : $4.80 $1.37 $1.68 NA NA NA NA NA NA NA NA <br />Triple shifts : $4.27 $0.91 $1.12 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $3.22 NA $3.93 NA NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.38 NA $0.63 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $7.32 $1.31 $0.00 $0.35 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.07 $0.00 $0.29 <br /> <br />USTED COST SUBTOTALS <br /> <br /> <br />epreciation .. <br />Ownership Costs <br /> <br />CFC .. _ <br /> <br /> <br />Overhead <br /> <br />Overhaul <br />Labor Parts .......... ..... . <br />Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS : <br />Single shifts : $6.40 $2.74 $3.35 $3.22 $2.43 $3.93 $2.14 $7.32 $1.31 $0.00 $0.35 <br />Double shifts : $4.80 $1.37 $1.68 ttachment no. 2: <br />Triple shifts : $4.27 $0.91 $1.12 $0.38 $0.28 $0.63 $0.35 $0.00 $0.07 $0.00 $0.29 <br /> <br /> <br />HOURLY OPERATOR WAGES <br /> <br />Base ................... ......... .... <br /> <br />Fringe ..... ::........ ............... ...... . <br /> <br />F.I.C.A. <br />. <br />........... ............................... <br />Unempl. <br />..................... <br />Wk.Comp. <br />................ <br />Total <br /> Rate Benefits 7.65% 6.20% 9.80'010 ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (-70hp $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $12.49 $20.69 $2.00 $32.78 $67.96 <br />Double shifts : $7.85 $20.69 $2.00 $32.93 $63.47 <br />Triple shifts : $6.30 11 $20.69 $2.00 $33.03 $62.02 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />Dozer : Cat D3G XL - 3P 70 NA 8.1 13.2 6.2 9.0 diesel NA <br />Blade : Power Angle Tilt NA NA 1.1 NA 8.1 3.1 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2: 13-shank ripper NA NA 0.6 2.6 5.1 1.1 NA Fixed Parallelogram <br />Total weight : 9.8 (UST) <br />.............._..............__.......__..........._..- <br />aw-
The URL can be used to link to this page
Your browser does not support the video tag.