Laserfiche WebLink
. <br />sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-GENERIC 3.9 in. - 3,100 ft. cagy. $71.24 1 $71.24 $71.24 <br />-Fuel Tanker, 4x2, 170 HP $64.11 1 $64.11 $64.11 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $135.35 $135.35 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 120.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 2.67 2.67 Total non-roadable mob/demob cost $11,049.68 <br />Return time (hours) = 2.67 2.67 * two round trips with haul rig <br />Loading time (hours) = 2.00 NA Total roadable mob/demob cost ** : $721.87 <br />Unloading time (hours) = 1.00 NA •* one round trip, no haul rig <br />Subtotals = 8.33 5.33 <br /> <br />JOB TIME AND COST Total job time : 16.67 hours <br /> Total iob cost : $11.772