My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-04_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2010-02-04_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:25:50 PM
Creation date
2/4/2010 1:03:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
REVISION
Doc Date
2/4/2010
Doc Name
Adjustment to Required Financial Warranty
From
DRMS
To
Alma Placer Company, LLC
Type & Sequence
SO3
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Basis : <br />Material weight <br />Material description <br />Top Soil <br />Rated payload <br />Payload capacity <br />Cycle Time : <br />Scraper loading time * : 1.80 <br />Maneuver and spread time : 0.60 <br />* load time per scraper pair on push-pull models <br />1,600 pounds/LCY <br />75,000 pounds <br />46.88 LCY <br />Scraper Bowl (volume) Basis : <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY *** <br />" hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 10,000 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 0.980 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.813 NA <br />Travel time : <br />Road condition description :Hard, smooth, stabilized, surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,000 -0.50 2.00 1.50 2939 0.53 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : <br />Return route 0.53 minutes <br /> 0.50 2.00 2.50 2949 0.48 <br /> <br /> <br /> <br /> <br /> <br /> <br />travel time for each segment is adjusted for acceleration/deceleration. Return time : <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />Unadjusted unit production/hour : 510.59 LCY/hour *** Adjusted for job conditions : <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : <br />Adjusted single scraper team (unit) hourly production : <br />Adjusted multiple scraper team (fleet) hourly production : <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : <br />Unit cost : $0.956 /LCY Total job cost : 0.48 <br /> <br />3.41 <br />415.31 <br />2 <br />830.63 <br />830.63 <br /> <br />11.36 <br />$9,019 minutes <br /> <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br /> <br />Hours
The URL can be used to link to this page
Your browser does not support the video tag.