My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-04_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2010-02-04_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:25:50 PM
Creation date
2/4/2010 1:03:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
REVISION
Doc Date
2/4/2010
Doc Name
Adjustment to Required Financial Warranty
From
DRMS
To
Alma Placer Company, LLC
Type & Sequence
SO3
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..................................... <br />HOURLY PRODUCTION sheet 2 of 2 <br />Haulina Capacity : <br />Scraper Payload (weight) Basis : I Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY <br />Material description <br />Top Soil <br />Rated payload : 75,000 pounds <br />Payload capacity: 46.88 LCY <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 10,000 <br /> Scraper Push dozer Source <br />Scraper loading time 1.80 minutes Altitude adj.: 0.980 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.813 NA <br />Travel time : <br />Road condition description :Hard, smooth, stabilized, surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,000 -0.50 2.00 1.50 2939 0.53 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time <br />Return route : <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 510.59 LCY/hour *** Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />0.53 <br />0.48 minutes <br />0.48 minutes <br />3.41 minutes <br />415.31 LCY/hour <br />2 scraper(s) <br />830.63 LCY/hour <br />830.63 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 11.22 Hours <br />Unit cost : $0.988 /LCY Total job cost : $9,201
The URL can be used to link to this page
Your browser does not support the video tag.