Laserfiche WebLink
RnOnARLE FOUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, Z500 Gal. $60.90 1 $60.90 $60.90 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $60.90 $60.90 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Breckenridge <br />Transportation Cycle Time : Non- Total one-way travel distance : 20.0 miles <br /> Roadable Roadable Average travel speed : 25.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.80 0.80 Total non-roadable mob/demob cost $5,336.60 <br />Return time (hours) = 0.80 0.80 • two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $97.44 <br />Unloading time (hours) = 0.50 NA •' one round trip, no haul rig <br />Subtotals = 2.60 1.60 <br />JOB TIME AND COST Total job time : 5.20 hours <br /> Total job cost : $5,434