Laserfiche WebLink
decreased. Included as Attachment E is a diagram illustrating the injection pressure monitoring design <br />and water flow from the storage tanks to the wellhead. <br />DRMS Item #6J If and when MD-03 is approved, DRMS will review the Powertech field notes for all <br />post-June, 2008 well sampling conducted in section 33, where the proposed pump test is to occur. <br />DRMS will contact Powertech to coordinate the review at the appropriate time. <br />Powertech Response to DRMS Item #6: <br />Powertech has all field notes for post-June, 2008 well sampling activities that were conducted in section <br />33. If and when MD-03 is approved, all the associated well sampling notes requested will be made <br />available to the DRMS for review.