My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 2/4/2010, 7:19:34 AM-JWD
DRMS
>
Public
>
REVISION - 2/4/2010, 7:19:34 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:52 AM
Creation date
2/4/2010 7:26:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
2/3/2010
Doc Name
Second Review Responses
From
Powertech (USA) Inc.
To
DRMS
Type & Sequence
MD3
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
decreased. Included as Attachment E is a diagram illustrating the injection pressure monitoring design <br />and water flow from the storage tanks to the wellhead. <br />DRMS Item #6J If and when MD-03 is approved, DRMS will review the Powertech field notes for all <br />post-June, 2008 well sampling conducted in section 33, where the proposed pump test is to occur. <br />DRMS will contact Powertech to coordinate the review at the appropriate time. <br />Powertech Response to DRMS Item #6: <br />Powertech has all field notes for post-June, 2008 well sampling activities that were conducted in section <br />33. If and when MD-03 is approved, all the associated well sampling notes requested will be made <br />available to the DRMS for review.
The URL can be used to link to this page
Your browser does not support the video tag.