Laserfiche WebLink
CIRCES Cost Estimating Software <br />PUMPING WORK <br />PROJECT IDENTIFICATION _ <br />_ <br />Task no. PUM State :Colorado Permit/job no. :M-2001-085 <br />Date : 0112612010 County :Adams Abbreviation :none _ <br />User : DB2 Site :120Th Avenue Estates Pit Filename : M085-PUM <br />Agency or organization name DRMS <br />Permit or other job action :AM-04 Bond recalculation <br />Task description :Pump standing water from pit <br />HOURLY EQUIPMENT COST <br /> <br />Description Quantity Data <br />Source <br />Pump : Centrifugal pump - 200M, 10 in. 4 (CRG) <br />Suction hose : Suction pipe - 10 in. diam., 25 ft. 16 (CRG) <br />Discharge hose : Discharge pipe - 10 in. D., 25 ft. 48 _ (CRG) <br />Labor : Pump operator 1 (CDOT/RSM) <br />Cost Breakdown : Job Utilization <br />Ownership cost/hour : $53.00 NA Job shiftbasis : 3 per day <br />Operating cost/hour : $88.55 100 % Horsepower : 70 <br />Operator cost/hour : $25.56 NA Weight (UST) 1.95 <br />Total cost/hour : $167.11 <br /> Total fleet cost/hour : $167.11 <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume : 217,000,000.00 gallons factor : 1.0000 volume : 217,000,000 gallons <br />Total pond inflow surface Unit inflow rate in Total pond inflow volume <br />area : NA sq. ft. gph/sq. ft.: NA per hour : 0.00 gph <br />Source of volume estimate :estimate <br />PUMPING TIME <br />Maximum pump capacity: 70 gph/pump Adjusted pumping capacity : 804,000 gph <br />Estimated suction head : 10 feet Initial unadjusted pumping time 269.90 hours <br />Estimated discharge head : 30 feet Inflow during initial pumping : 0 gallons <br />Total head : 40 feet Net unadjusted pumping time : 269.90 hours <br />CPB pump capacity: 201,000 gph/pump Altitude adjustment factor : 1.0638 (3% rule) <br />Site altitude : 5,030 feet Pump efficiency factor : 1.0909 (55 min./hr.) <br />Inflow as % of pond volume : NA % Total adjusted pumping time : 313.23 hours <br />JOB TIME AND COST <br /> Total job time : 313.23 hours <br />Unit cost : $0.000241 per gallon Total job cost : $52,345