My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-02_REVISION - M2001085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001085
>
2010-02-02_REVISION - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:16 PM
Creation date
2/4/2010 7:26:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
REVISION
Doc Date
2/2/2010
Doc Name
Amendment Approval
From
DRMS
To
Les Ewegen LLC
Type & Sequence
AM4
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADARLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 6x4, 45K GVW $64.12 1 $64.12 $64.12 <br />0 Gal. <br />-Water Tanker, 2,50 $62.01 1 $62.01 $62.01 <br />_ <br />-Fuel Tanker, 4x2, 170 HP $71.21 1 $71.21 $71.21 <br />_ <br />-Lube Truck, 4x2, 170 HP $79.11 1 $79.11 $79.11 <br />-Light Duty Pickup, 4x4, 314 T. $50.59 1 $50.59 $50.59 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $327.04 $327.04 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Brighton <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.14 0.14 Total non-roadable mob/demob cost $9,130.86 <br />Return time (hours) = 0.14 0.14 * two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $93.44 <br />Unloading time (hours) = 1.00 NA *• one round trip, no haul rig <br />Subtotals = 2.29 0.29 <br />JOB TIME AND COST Total job time : 4.57 hours <br /> Total job cost : $9,224 <br />G -- .41d 4
The URL can be used to link to this page
Your browser does not support the video tag.