Laserfiche WebLink
? V L(, <br />sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DRMS <br />TOP State : Colorado <br />0112712010 County :Adams <br />DB2 Site :120Th Estates Pit <br />Permit or other job action :Am-04 Bond Recalc <br />Task description :Spread Topsoil <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Description <br />Cost Bre <br />Total work team cost/hour : $891.95 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 14,520 LCY factor : NA volume : 14,520 LCY <br />Scraper work team -Scraper : Cat 657E w/push-pull _ <br />-Push dozer:NA <br />Support equipment -Load area I NA -Dump area :Cat D7R DS Series 11 - 7SU <br />Road maintenance -Motor grader : NA <br />-Water truck :Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer NA misctruk <br />% Utilization-machine : 100 NA NA 100 NA 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $113.35 NA NA $40.93 NA $8.32 <br />Operating cost/hour : $202.03 NA NA $53.15 NA $3.75 <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour : $38.91 NA NA $38.54 NA $38.70 <br />Unit subtotals : $354.29 NA NA $132.61 NA $50.76 <br />Number of units : 2 0 0 1 0 1 <br />Group subtotals : Work : $708.57 Support: $132.61 Maintenance : $50.76 <br />Source of quantity take-off :mining plan <br />Source of estimated swell factor : NA <br />Permit/job # : M-2001-085 <br />Abbreviation :none <br />Filename :M085-TOP