Laserfiche WebLink
SUMMIT ENGINEERING CO <br />PROFESSIONAL ENGINEERS AND LAND SURVEYORS <br />P.O. Box 1897 <br />ALAMOSA, COLORADO 81101 <br />(719)589-6147 FAX (719) 589-6633 <br />EMAIL: scott4622@gmail.com <br />January 28, 2010 <br />Mr. Michael A. Cunningham <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Robins Rock Pit; DRMS File No. M-2009-053; Response to AR-2 dated January 13, 2010 <br />Dear Mr. Cunningham; <br />In response to the above captioned Preliminary Adequacy Review-2 we submit the following: <br />6.3.4 Exhibit D - Reclamation Plan <br />3. We have indicated 4 phases with Roman Numerals on both the Mining Plan Map and the <br />Reclamation Plan Map. Phase I of reclamation will begin in 2011, or at such time as mining in <br />phase I is complete. <br />6.3.5 Exhibit E - Map <br />5. The existing disturbed area is shown as "brick" hatching on the map we submitted by email <br />this morning. <br />We believe that the submittal of the maps together with this response and our fax of January 20, <br />has responded to your letter of January 13, 2010 captioned above. <br />If you have any questions, please call me. <br />Yours Truly, <br />Scott E. Johnson