My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-29_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-01-29_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
2/2/2010 7:50:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/29/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 1/3/2010 and 1/10/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />Blasting was performed in these areas Tuesday (1/5/2010), Wednesday (1/6/2010), and <br />Thursday (1/7/2010). <br />G) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Process. A CAT D-8 <br />dozer, a CAT 320 excavator, and a CAT 966 front-end loader were used to process the material. <br />Location This Week <br />tons Cumulative Comments <br />So Cresson Clay Processing 19,647 164,761 <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 19,647 196,669 Includes processed before break. <br />2) Low Volume Solution Collection Fill <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Process. A CAT D-8 <br />dozer and a CAT 980 front-end loader were used to process the material. <br /> This Week Cumulative <br />Location Comments <br /> tons <br />Dump 4 LVSCF Processing 27,813 27,813 Includes processed prior to 1/8 <br />H) ADR and Crusher Waterlines <br />Pipe trench excavation and bedding was performed throughout the week for the Crushing <br />waterline using a CAT 330 excavator and a CAT 966 front-end loader. The pipe bedding material <br />was moisture conditioned and compacted using the bucket of the CAT 330 excavator. <br />Approximately 75 linear feet of pipe trench was excavated and bedded during the week. <br />Preparations for ADR waterline tie-ins were performed throughout the shift. Exposure of existing <br />waterlines was performed near stations A24+00 (+/-) and E22+00 (+/-). <br />The 12" HDPE temporary tie-in was performed, near station E22+00 (+/-), was performed Friday <br />January 8, 2010. <br />I) Miscellaneous <br />Haul road construction was performed into the East Cresson Clay Borrow area using two 40-ton <br />articulating haul trucks loaded with adjacent material by a CAT 966 front-end loader. Material was <br />pushed over the stripped area using a CAT D-8 dozer. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />Grouting of confirmatory drill holes (missed-no void) at Underground Workings #3006 and #3007 <br />was performed. <br />VLF Weekly Report WE 01.09.10.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.