My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-29_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-01-29_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
2/2/2010 7:50:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/29/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 1/3/2010 and 1/10/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.ameO <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: January 9, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Reporting Period: 1/3/10 through 1/9/10 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: -4°F to 18°F (+/-) High: 23°F to 40°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Ames resumed work activities Monday January 4, 2010 after observing the Christmas and New <br />Year's holidays. <br />Ames did not haul fill material Monday January 4, 2010, due to frost removal and fill <br />preparations needed from the previous two weeks of inactivity. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />A small amount of clearing and grubbing was performed to allow for haul road construction at <br />the East Cresson Clay Borrow. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 0 1.09. 1 O.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.