Laserfiche WebLink
.ameO <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: January 9, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Reporting Period: 1/3/10 through 1/9/10 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: -4°F to 18°F (+/-) High: 23°F to 40°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Ames resumed work activities Monday January 4, 2010 after observing the Christmas and New <br />Year's holidays. <br />Ames did not haul fill material Monday January 4, 2010, due to frost removal and fill <br />preparations needed from the previous two weeks of inactivity. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />A small amount of clearing and grubbing was performed to allow for haul road construction at <br />the East Cresson Clay Borrow. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 0 1.09. 1 O.D.doc