Laserfiche WebLink
Exhibit-E <br />Mining Plan Map <br />7--t-ot' <br />C <br />0 <br />-O T <br />O O <br />O <br />0 <br />a / <br />Notes: \ <br />1. Seed topsoil stockpile if left longer then one year. <br />2. Concurrent reclamation; overburden to base of <br />excavation in compacted lifts, concurrent with mining 30' buffer along <br />3. All storm water contained in excavated area. northwesterly fence line <br />100' 200' 300' <br />Topsoil stockpile <br />Jay Wagner <br />Subject Property <br />approximately <br />8.2 ACRES <br />site total <br />goy <br />o? <br />°a C? <br />\V 0 <br />0t <br />?eG"pt` <br />d? <br />direction of mining <br />Access <br />(lockable <br />double gate) <br />\A Crusher <br />1???• approximately LJ 6.2 ACRES <br />pit area <br />CY) <br />Area for temporary o ? <br />overburden stockpiling prior T <br />to backfill and compaction U <br />if necessary C= Ln <br />1204' N 88' W <br />fence 30' buffer along south and east fence