Laserfiche WebLink
POND DISCHARGE <br />The following table presents monitoring results for the mine seepage discharge. <br />Water was diverted to the new treatment pond during the week of June 14 to June 21, <br />1999. On August 2, 1999 the new treatment pond was full and discharging. <br />Bear performed lab analysis on the flow from the spring (hillside) as well as the pond <br />outflow during the year. Following are the data. <br />January 2009 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3150 3190 <br />Total Suspended Solids mg/1) U U <br />Iron (mg/1) 1.3 0.36 <br />Februa 2009 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 2820 3140 <br />Total Suspended Solids (mg/1) 12 U <br />Iron (mg/1) 0.95 1.70 <br />March 2009 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3110 3180 <br />Total Suspended Solids (mg/1) 11 U <br />Iron (mg/1) 1.2 1.71 <br />April 2 009 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3050 3130 <br />Total Suspended Solids (mg/1) 8 U <br />Iron (mg/1) 1.0 1.7 <br />May 2009 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3490 3540 <br />Total Suspended Solids (mg/1) 9 U <br />Iron (mg/1) 0.89 1.87 <br />June 2 009 <br /> Pond Hillside <br />Total Dissolved Solids (mg/1) 3660 3490 <br />Total Suspended Solids (mg/1) U U <br />Iron (mg/1) 0.65 1.72 <br /> <br />-5-