Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 003 State : Colorado Permitrjob# : C-1983-059 <br />Date : 0410912008 <br />User: JRS <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Move Sediment Storage Pile for On-Site Disposal <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower: 405 <br />Shiftbasis : 1 per day <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br /> <br /> <br />MATERIAL QUANTITIES .... <br />Initial Swell Loose <br />volume : 1,500 CCY factor : 1.125 volume : 1,688 LCY <br /> <br />Source of estimated volume : Map 5 and Page 2.05-3 <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HS) <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude 1.00 (Cat HB) <br />Average site altitude : 5,800 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 lbs/LCY Net correction : 0.51 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 353.60 LCY/hr <br /> Adjusted fleet production : 353.60 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 4.77 Hours <br />Unit cost : $0.587 /LCY Total job cost : $990 <br /> <br />County :Delta <br />Site : Terror Creek Loadout <br />Abbreviation : none <br />Filename : C059-003