My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-21_PERMIT FILE - M2009082 (11)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009082
>
2010-01-21_PERMIT FILE - M2009082 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:47 PM
Creation date
1/29/2010 7:46:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009082
IBM Index Class Name
PERMIT FILE
Doc Date
1/21/2010
Doc Name
Response to Adequacy Review #1 Comments
From
Vecchi & Associates, LLC
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I, VECCHI &ASSOCIATES, LLC URBAN PLANNING & DESIGN <br />P .O. Box 1 175 Longmont, co 80502-1 175 Phone 303-774-0173 Fax 303-774-0173 VecchiAssociates@comcast.net <br />January 20, 2010 <br />RECEIVED <br />Mr. Jared Ebert JAN 2 1 2010 <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety Division of Reclamation, <br />Department of Natural Resources Mining & Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Response to Adequacy Review #1 Comments for Lafarge West, Ines Parsons <br />Mine, DRMS File # M-2009-082 <br />Dear Jared: <br />This letter is in response to your Adequacy Review #1 and #2 Comments for Lafarge <br />West, Inc's Parsons Mine, DRMS File # M-2009-082. Below is a listing of each of your <br />comments followed by our responses in italics. <br />Adequacy Review #1 Comments and Responses: <br />6.4.3 EXHIBIT C - Pre-mining and Mining Plan Map(s) of Affected Lands <br />1. Please describe what "typical berm planting" means? Why do only certain berms <br />have "typical berm plantings" while others do not? <br />The only berms indicated on the mining plan that will remain in place after mining is <br />completed are located on the northern and eastern perimeters of Phase 2. A detail <br />illustrating the plantings has been added to Exhibit C. The remaining berms consist <br />of material stockpiles and will be used for reclamation. They will be seeded to the <br />specified dryland grass mix. <br />6.4.4 EXHIBIT D - Mining Plan <br />2. Please specify the depth that topsoil will be stripped. <br />Bore logs for the site indicate 6" to 24 " of topsoil are present on various portions of <br />the site. Lafarge will determine the depth of topsoil during initial stripping for each <br />phase and isolate topsoil for use during reclamation of each phase. A minimum of 6" <br />of topsoil will be stripped and stockpiled for each phase. Sufficient topsoil will be <br />stockpiled to reclaim all disturbed areas for each phase.
The URL can be used to link to this page
Your browser does not support the video tag.