Laserfiche WebLink
HYDROLOGIC MONITORING REQUIREMENTS FOR 2008-2009 <br /> DESERADO MINE - PERMIT NO. C-1981-018 <br /> Monitoring Sample <br />Well Site Piezometer No. Monitored Stratum Frequency Parameters <br />Ground Water: <br />Qal-5 N/A White River Alluvium Quarterly Depth-to-water, pH, cond., Temp. <br /> Annual Full Suite (Attachment A) <br />21012-17 2-17U Upper Sandstone Facies Annual Depth to water only <br /> 2-17L Lower Sandstone Facies Annual Depth to water only <br /> TW2-17M Siltstone & Coal Facies Annual Depth to water only <br />21014-20 4-20U Upper Sandstone Facies Annual Depth to water only <br /> 4-20L Lower Sandstone Facies Annual Depth to water only <br />310122-2 22-21- Lower Sandstone Facies Annual Depth to water only <br />310122-3 22-3U Upper Sandstone Facies Annual Depth to water only <br /> 22-3M Siltstone & Coal Facies Annual Depth to water, pH, conductivity, <br /> temperature, dissolved iron, diss. <br /> manganese, TDS <br />310129-4' 29-4U Upper Sandstone Facies Annual Depth to water only <br /> 29-4M Lower Sandstone Facies Annual Depth to water <br />310130-8 30-8U Upper Sandstone Facies Annual Depth to water only <br /> 30-8M Siltstone & Coal Facies Annual Depth to water only <br />310131-7 31-7m Siltstone & Coal Facies Annual Depth to water only <br />310132-7' 32-7U Upper Sandstone Facies Annual Depth to water only <br /> 32-7M Siltstone & Coal Facies Annual Depth to water only <br /> 32-71- Lower Sandstone Facies Annual Depth to water only <br />310133-8 33-8U Upper Sandstone Facies Annual Depth to water only <br /> 33-8M Siltstone & Coal Facies Annual Depth to water only <br /> 33-81- Lower Sandstone Facies Annual Depth to water only <br />These holes will be sampled and analyzed prior to mining through or bond release. Sampling will be limited to the middle facie <br />zone. <br />NOTE: All surface water monitoring has been discontinued since DRMS's approval of the amendment in August 1997 (TR47). <br />Monitoring Wells 22-2L, 22-3M, and 22-3U were added to the monitoring requirements with Permit Revision #6 starting with the <br />2008-2009 hydrologic year. <br />A-1