My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-28_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2010-01-28_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:04 PM
Creation date
1/28/2010 12:55:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
1/28/2010
Doc Name
Final Decision Letter
From
DRMS
To
Twentymile Coal Company
Type & Sequence
TR71
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 015 State : Colorado Permit/job# : C-96-083 <br />Date : 0112612010 County:Delta Abbreviation :none <br />User : JRS Site: Bowie No. 2 Mine Filename :C083-015 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safi <br />Permit or other job action : 2009 Midterm Review <br />Task description : Backgll and Regrade B-Seam Portal Bench <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2:3-shank riooer <br />Horsepower:-- 570 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $89.77 NA <br />Operating cost/hour : $128.30 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $256.60 Total fleet cost/hour : $1,026.41 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 32,000 CCY factor : 1.165 volume : 37,280 LCY <br />Source of estimated volume : Operator Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.54 (Cat HB) <br />Average push gradient : 20.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,750 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.19 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 240.67 LCY/hr <br /> Adjusted fleet production : 962.67 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 38.73 Hours <br />Unit cost : $1.066 /LCY Total job cost : $39,749
The URL can be used to link to this page
Your browser does not support the video tag.