PROJECT IDENTIFICATION <br />Date : 26-Jan-10 Permit C-1996-083 Site: Bowie No. 2 Mine <br />User: JRS State : Colorado <br /> Filename: C083-00a County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2009 Midterm Review <br /> Backfilling and Rough Grading Tasks - Tasks 001-027 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />001 Pull Back and Haul Portal Bench Fill Material to Cut Slope 615.10 $341,057 <br />002 Regrade D-Portal Bench 157.94 $162,108 <br />003 Pull Up Material for Utility Corridor 27.56 $11,994 <br />004 Regrade Utility Corridor 4.48 $4,601 <br />005 Rip and Regrade Material Storage Area at Gob Pile 1.73 $1,777 <br />006 Pull Back Material at Old Truck Loadout Material Storage Area 23.48 $10,220 <br />007 Regrade Old Truck Loadout Material Storage Area 8.20 $8,420 <br />008 Pull Back Material at Truck Loadout/Coal Stockpile 162.92 $70,900 <br />009 Regrade New Truck Loadout and Coal Stockpile 32.39 $33,242 <br />010 Pull Material Back Onto Train Loadout Facilities and Railbed Benches 476.64 $207,428 <br />011 Regrade Train Loadout Facilities and Railbed Benches 171.49 $176,018 <br />012 Backfill and Regrade Train Loadout Overland Conveyor Corridor 5.61 $5,760 <br />013 Haul Fill from Upper Material Storage Area to B-Seam Portal Bench 90.83 $39,213 <br />014 Haul Fill from Adjacent Material Storage Area to B-Seam Portal Bench 103.68 $51,918 <br />015 Backfill and Regrade B-Seam Portal Bench 38.73 $39,749 <br />016 Pull Material Back Onto Freeman Gulch Vent Shaft Bench 2.56 $1,113 <br />017 Push Material from Freeman Gulch Vent Shaft Back to Cut Slope 0.48 $490 <br />018 Regrade Freeman Gulch Vent Shaft Pad 8.42 $8,642 <br />019 Regrade Drill Pads from MR's and TR's 68.92 $70,736 <br />020 Regrade Material Storage Area from TR-29 0.48 $492 <br />021 Backfill and Regrade New Prep Plant Bench 36.97 $37,947 <br />022 Replace Fill from Material Storage Area to Water Tank Bench 1.66 $717 <br />023 Regrade Borrow Area 19.15 $19,656 <br />024 Regrade Hubbard Creek Vent Shaft Pad 1.89 $1,936 <br />025 Regrade Upper Parking Lot Expansion Area 3.66 $796 <br />026 Haul Material from Bowie No. 1 Mine Stockpile to Hubbard Creek Vent Shaft 33.18 $26,913 <br />027 Haul Rock to Vent Shafts for Disposal 11.99 $4,624 <br /> Total Direct Cost 2,110.14 $1,338,467 <br />jrs 26-01-10