My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-28_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2010-01-28_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:04 PM
Creation date
1/28/2010 12:55:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
1/28/2010
Doc Name
Final Decision Letter
From
DRMS
To
Twentymile Coal Company
Type & Sequence
TR71
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C-1996-083 <br />Task 165 - Structural Demolition <br />Task: 165 Site: Bowie No. 2 Mine Date: 26-Jan-10 User: JRS <br />Permit Action: 2009 Midterm Review County Delta <br />Description: Demolish and Remove All Structures File Name: C-1996-083 <br /> <br /> Description Reference Quantity Unit Cost Total Cost <br /> <br /> Clean Material Storage Areas $ - <br /> - Gob Pile 968 CY $13.3500 $ 12,922.80 <br /> - Haul Road Piles (2) 484 CY $13.3500 $ 6,461.40 <br /> - Topsoil Stockpile A 1,839 CY $13.3500 $ 24,550.65 <br /> - Portal Bench/Light-Use Road (2) 1,670 CY $13.3500 $ 22,294.50 <br /> <br /> PORTAL LEVEL CONVEYOR AND RECLAIM <br /> <br /> Portal Conveyor 140 LF $41.3100 $ 5,783.40 <br /> - Footing 5 LF $20.5900 $ 102.95 <br /> Gob Belt 81 LF $41.3100 $ 3,346.11 <br /> - Footing 2 LF $20.5900 $ 41.18 <br /> Stockpile Conveyor 393 LF $41.3100 $ 16,234.83 <br /> - Footing 16 LF $20.5900 $ 329.44 <br /> Reclaim Conveyor 402 LF $41.3100 $ 16,606.62 <br /> - Footing 18 LF $20.5900 $ 370.62 <br /> Off-Spec Coal Conveyor 111 LF $41.3100 $ 4,585.41 <br /> - Footing 4 LF $20.5900 $ 82.36 <br /> Collecting Conveyor 76 LF $41.3100 $ 3,139.56 <br /> - Footing 2 LF $20.5900 $ 41.18 <br /> Radial Stacker #1 150 LF $41.3100 $ 6,196.50 <br /> - Footing 6 LF $20.5900 $ 123.54 <br /> Radial Stacker #2 80 LF $41.3100 $ 3,304.80 <br /> - Footing 1 LF $20.5900 $ 20.59 <br /> Stoker Collecting 29 LF $41.3100 $ 1,197.99 <br /> - Footing 2 LF $20.5900 $ 41.18 <br /> Stacking Tube (18" Thick) 3,204 CF $0.2257 $ 723.14 <br /> - Structure 8,000 SF $0.2257 $ 1,805.60 <br /> - Footing 200 LF $10.2900 $ 2,058.00 <br /> Reclaim Tunnel Part 1 9,065 SF $7.7700 $ 70,435.05 <br /> Reclaim Tunnel Part 2 1,481 SF $7.7700 $ 11,507.37 <br />Page 3 of 12
The URL can be used to link to this page
Your browser does not support the video tag.