Laserfiche WebLink
clarification and modification appears to be warranted. In particular, Sta. 42+00 <br />and Sta. 47+00 cross-sections both contain blue line segments labeled "Original <br />Ground Surface" inside the "2007 Reclamation Limit", that would appear to in fact <br />be remnant cut slopes, which should be delineated and labeled as such. <br />Please provide further updates to Figure 3.1-8A, as appropriate. <br />CAM: 'Remnant Cut Slope' added to sections Sta. 42+00 and 47+00. Please <br />see revised Figure 3.1-8A <br />h) Figure 3. 1-9A was properly updated. Item Resolved. <br />2. There still are inconsistencies noted in the ditch/channel specifications <br />submitted with this most recent package. Some of the problems noted are <br />described below: <br />- Structure #11 is not defined in the 10-YR event SEDCAD run (page 32) yet it is <br />included on page 53 Structure Summary submitted with this recent package. <br />Further, the DRMS was previously instructed to remove the as-constructed 10- <br />YR event demonstration which contained a description of Structure #11 as Ditch <br />M. <br />- The revised Structure Summary page 33 is confusing because it shows peak <br />discharges apparently from the as-constructed SEDCAD demonstrations which <br />as previously mentioned DRMS has been instructed to remove with the October <br />2007 submittal. It is unclear why this information is shown here and which <br />Subwatershed Hydrology Detail supports the peak discharge and runoff <br />information shown on revised page 33. <br />- The revised Structure Summary (page 53) and revised Subwatershed <br />Hydrology Detail (page 57) does not match the information contained in the 100- <br />YR event SEDCAD demonstration for Structure Detail beginning on page 54 of <br />the existing permit application. The Subwatershed Hydrology Detail for the 100- <br />YR event was revised with the December submittal but the Structure Detail was <br />not changed with either the October or December revisions for the 100-YR event. <br />The design discharges shown in the Structure Detail beginning on page 54 of the <br />permit application package does not match the revised information submitted in <br />December for Ditches D, I, J, and CMP2. <br />In summary, the presentation is confusing and appears to contain conflicting <br />information. Please thoroughly check the SEDCAD demonstrations and all <br />summary tables and make changes as needed to ensure a consistent and <br />accurate presentation of the ditch and sediment pond design and as-constructed <br />information presented in Appendix M(vii). Please re-submit the entire Appendix <br />M(vii) as one single package which includes the existing information contained in