Laserfiche WebLink
75. Dan Mathews -2- October 3, 2007 <br />9. Updated Figure 2.2-6 to reflect the 2007 as-built reclaimed configuration. <br />Hydrologic data for ditches K, L, C, D, F, I and J was updated to reflect as- <br />built configuration and included as new SedCad pages M(vii)-34, 35, 41, <br />42, 43, 44 and 45. Page M(vii)-26, the engineers certification of the As- <br />built interim configuration has been updated and is included. <br />10. Updated Section C-C (Coverfill Stockpile) and Section D-D (Gob Pile) on <br />Figure 2.2-7 as well as the ditch size tables for the as-built 2007 <br />reclaimed configuration gob ditches, (interim and final). The 'As-Built' <br />designation for the ditch sizing tables was eliminated as the 'as built' is <br />now the 'interim reclamation' configuration. Page M(vii)-4, the summary <br />table for the old 'as-built' configuration will be removed from the perni t. <br />Permit pages showing the PHC and SedCad output, pages M(vii)-1 to 25 <br />will be removed from the permit. Permit page M(vii)-1 i (Master ditch <br />summary page) will be renamed page M(vii)-1. <br />11. Updated ditch and culvert summary sheets, M(vii)-29 and 51. <br />Please fee free to contact me if you have any questions. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Enclosures <br />Volume I: Tables: Master Ditch Summary Sheet, 3.9-3 <br />Volume 11: Figures: 2.2-6, 2.2-7, 3.1-5, 3.1-6, 3.1-7, 3.1-8a, 3.1-9a <br />Volume III: Pages: M(vii)-1(old permit page M(vii)-11) - 26, 29, 34, 35, 41, 42, <br />43, 44, 45 and 51.