Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year Z°O9 <br />, <br />0)(60 &J KAtWt0(r 4 L C <br />E I k C? k w/1 ? ?e <br />mine name <br />C- IIIV- Qzz- <br />Oxeow wl )nJip1G• , LcC• <br />Permittee <br />permit # <br />Address: r X s3 S 3737 14, -JQy 133, Sow.e nsel 64 a' A13`/ <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed /S8 . S Z + le. 63 <br />= <br />7 . / S <br />Acres backfilled and graded SS • 6 2, + 3 , _ Z . / <br />Acres to soiled S t? • 2 + 3, 9 9 = 6 Z• 6 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />aarh rntannrv hplnw nn not inclurip arras that have nrhieveri final- Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded* goo, rn Z + 3 '9 9 = G z . G S 7. o I + S- . & <br />"include, it necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed I J ? ' / S and the total number of acres: <br />Phase I released D Phase II released 0 Phase III released 0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 <br />Acreage in active mining areas 3 /U 19 <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />i??.is <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded