My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-26_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-01-26_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:59 PM
Creation date
1/26/2010 2:36:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/26/2010
Doc Name
Letter & Revised Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C-1996-083 <br />Task 165 - Structural Demolition <br />Task: 165 Site: Bowie No. 2 Mine Date: 26-Jan-10 User: JRS <br />Permit Action: 2009 Midterm Review County Delta <br />Description: Demolish and Remove All Structures File Name: C-1996-083 <br /> <br /> Description Reference Quantity Unit Cost Total Cost <br /> <br /> DOWNHILL CONVEYOR STRUCTURES <br /> <br /> Portal Bench to Transfer Tower Conveyor 800 LF $16.5300 $ 13,224.00 <br /> - Elevated Portion 120 LF $41.3100 $ 4,957.20 <br /> - Footing 38 LF $20.5900 $ 782.42 <br /> - Tunnel Structure 100 LF $58.1900 $ 5,819.00 <br /> <br /> Transfer Tower to Stockpile 2,280 LF $16.5300 $ 37,688.40 <br /> - Elevated Portion 475 LF $41.3100 $ 19,622.25 <br /> - Footing 112 LF $20.5900 $ 2,306.08 <br /> - Tunnel Structure 80 LF $58.1900 $ 4,655.20 <br /> <br /> Downhill Conveyor Transfer Tower Structure 6,400 CF $0.2257 $ 1,444.48 <br /> - Concrete Pad 256 SF $1.7158 $ 439.24 <br /> - Footing 65 LF $10.2900 $ 668.85 <br /> <br /> Wildlife Structures 300 LF $58.1900 $ 17,457.00 <br /> <br /> TRUCK LOADOUT/STOCKPILE AREA <br /> <br /> Reclaim Conveyor 395 LF $16.5300 $ 6,529.35 <br /> - Elevated Portion 180 LF $41.3100 $ 7,435.80 <br /> - Footing 24 LF $20.5900 $ 494.16 <br /> - Tunnel Structure 180 LF $58.1900 $ 10,474.20 <br /> <br /> Loadout Reclaim Stacker Tube 8,000 CF $0.2257 $ 1,805.60 <br /> - Tube 4,524 SF $1.7158 $ 7,762.28 <br /> - Footing 44 LF $10.2900 $ 452.76 <br /> <br /> <br /> <br />Page 5 of 12
The URL can be used to link to this page
Your browser does not support the video tag.