Laserfiche WebLink
C-1981-008 <br />PR-06 PAR <br />Rule 2.05.3(33) - Mine Facilities <br />22-Jan-2010 <br />Page 8 of 26 <br />WFC has submitted certain revisions to Section 2.05.3(3). In addition to those changes <br />proposed, we note that items numbered 2 through 9 in this section might be more suitably <br />located in Section 2.05.3(4) - Ponds, Impoundments, Other Treatment Facilities and Diversions. <br />However, given the number of maps and internal cross references, we will not request that the <br />contents of the permit be rearranged with this permit revision. This is a comment only; no <br />response is required. <br />15. Page 12 of this section discusses dewatering of the mine as it relates to Pond 007. The <br />same subject is discussed on Page 20 with respect to Pond 011. It is our understanding <br />that water pumped from the pit was directed to Pond 007 until sometime in 2008, when <br />flows were redirected to Pond 011. In addition, both of these sections of the permit state <br />that a new discharge point had been applied for. WFC's updated discharge permit with <br />the CDPHE WQCD was subsequently issued, and incorporated into the permit with MR- <br />74 in August 2008. <br />Please revise the pit dewatering sections for Ponds 007 and 011 to be consistent with <br />one another; to note the month and year that dewatering transferred; and to <br />indicate that the discharge permit has indeed been issued. <br />16. The first paragraph on page 23 of this section reads, "As of the Permit Amendment of <br />2009..." Please change the text to read "As of Permit Revision No. 6..." <br />17. The last sentence of the third paragraph on Page 24 refers to Ponds 014 and 105. Please <br />change the "105" to "015". <br />18. Pages 36 and 37 of this section address the design for the mine traffic crossing of the <br />reclaimed 2700 Road. The detail shows an asphalt-paved surface, when what has been <br />constructed is a concrete-paved crossing. Please provide an explanation of the change <br />in roadway surface and any other changes that were made to the approved section, <br />along with a new professional certification. <br />19. Table 2.05.3(3)-3 on Page 39 gives the timing of road, ditch and utility detours and <br />restorations. Please update this table to provide actual years for those activities <br />which have already occurred and current estimates of when the remaining items <br />will be completed. <br />20. Table 2.05.3(3)-5 on Page 58 shows the timing of overhead power and buried phone <br />relocations. Please update this table to reflect the current status <br />21. Attachment 2.05.3(3)-8 contains several different documents relating to road and <br />structure agreements. Please provide a table of contents with this attachment, <br />identifying each separate document by name, date and parties. Pages 24, 28, 35 and <br />42 are blank in the copy received by the Division. Pages 27, 36 and 37 appear to be