My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-25_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2010-01-25_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:52 PM
Creation date
1/25/2010 9:47:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
1/25/2010
Doc Name
Adequacy Response
From
Peabody Energy
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NA2?dq <br />Peabody Energy <br />January 21, 2010 <br />Mr. Tom Kaldenbach <br />Division of Reclamation Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />.?v V <br />JAN 2 5 2010 <br />p?vision of an d Salead n, <br />DAintn9 <br /> <br />701 Market Street <br />St. Louis, Missouri 63101-1826 <br />314-342-3400 <br />RE: Adequacy Response and Permit Application Update package, Sage Creek Coal <br />Company, Peabody Sage Creek Mine <br />Dear Mr. Kaldenbach: <br />On behalf of Sage Creek Coal Company (SCCC), Peabody Energy hereby transmits three (3) <br />copies of an adequacy response and permit application update package for the proposed Peabody <br />Sage Creek Mine (PSCM). The original permit application package (PAP) was submitted to the <br />Division on June 12, 2009. The PAP was deemed complete on June 30, 2009. <br />The Division's preliminary technical adequacy review was issued on August 28, 2009 with <br />additional adequacy comments forwarded by the Division on September 11 and September 25, <br />2009. Colorado Division of Wildlife comments were forwarded to SCCC on January 4, 2010. <br />The enclosed response package addresses all adequacy comments in detail. Responses to <br />adequacy comments are addressed in the attached SCCC response document and correspondingly <br />in revised or updated PSCM PAP sections. As appropriate, these revised or updated PAP <br />sections are referenced in the adequacy response document. Major changes to the mine and <br />operations plan, facilities, and reclamation plan have occurred since the original PAP submittal <br />and these are reflected in the enclosed package. These changes and the response to adequacy <br />comments have resulted in major context and organizational changes to the original PAP <br />submittal including complete replacement of many of the sections and maps. Several new maps <br />and Exhibits have also been added. Detailed insertion instructions have been developed to aid in <br />updating the PAP. The adequacy comment responses and insertion instructions for the updated <br />PAP materials are included as separate attachments to this letter. <br />The mine plan contains no references to longwall mining as only facilities construction, mine <br />development, and mine operations using continuous miners and room and pillar methods are <br />planned for the current life of mine (5 year term). If mining conditions, coal quality and <br />acquisition, and customer markets continue to prove favorable, future mining may be expanded. <br />In that event, a complete revision package addressing all applicable rules and regulations will be <br />submitted to the Division for review and approval. <br />SCCC requests timely review of the PSCM PAP update and response to adequacy comments. <br />Questions pertaining to the PAP update materials and responses may be directed to either Vern
The URL can be used to link to this page
Your browser does not support the video tag.