(e) An approximate timetable to describe the mining operation is shown on the Mining Plan Map <br />- Exhibit "C". The life of this mine may extend beyond the 68 years as listed on the mining plan map, <br />this depends upon demand for the product; this time line may be shorter or longer. This mine will <br />be a year round operation with no planned extended cessation of operations at this mine site. It is <br />proposed to use a floating bond on 23 acres on this operation as mining is completed in the mining <br />units as proposed (see Mining Map Exhibit "C"). The mining plan has eleven (9) phases to be <br />excavated ranging in size from about 8.96 acres to 22.84 acres. It is planned that it will take <br />approximately ten (10) years per phase maximum for the larger area Phases less for the smaller size <br />Phases please see MINING PLAN MAP Exhibit "C". <br />(i) The estimate of the periods of time, which is stated above of ten (10) years per phase, is a best <br />estimate at this time. Then it will take between 3 to 5 years to establish the reclaimed area back to <br />rangeland that may be considered for release by the Mined Land Reclamation Board ofthe Division <br />of Mining and Geology. The reclamation will be an ongoing process as soon as the first unit is <br />deemed mined-out, and the phasing of the mining and reclamation will follow a natural progression <br />with final reclamation as the ultimate goal. <br />(ii) As stated in this report, the mining and affected land will range between 8.96 acres to 22.84 acres <br />with a maximum of 22.84 acres being disturbed at any time. Reclamation would be occurring on the <br />lands mined out concurrently with mining. <br />(iii) The sequence in which each stage or phase will be carried out is outlined in this report. Also, <br />please see Mining Map Exhibit "C". Mining will start in Phase 1 one in the west central part of the <br />permitted area and move to the west the process area will be set up in this segment which is north <br />of County Road 611.1. Next mining will start in Phase 2 two starting east of Phase 1 moving east <br />also this segment is north of County Road 611.1. Phase 3 three will begin in the most eastern <br />segment and north of County Road 611.1 and move to the east to the eastern boundary of the permit <br />area. The fourth Phase 4 four will start in the most western segment of the permit boundary north <br />of County Road 611.1 and move to the west. Phase 5 five will start on the south of County Road <br />611.1 on the said east section line of Section 31 and move to the west. Phase 6 six will start on the <br />west section line of said Section 32 and move east south of County Road 611.1. Mining will continue <br />to move east through Phase 7 seven and Phase 8 eight to the eastern permit boundary. Phase 9 nine <br />will be mined in the southeastern corner of the permit boundary in said Section 32. <br />(f) The backslopi.ng and final pit floor will be done in concert with the mining. It is planned to start <br />reclaiming 5 to 10 acres areas as they are deemed mined-out. This allows the operator the allotted <br />time to establish a planned reclamation plan and continue to mine, hence the 23-acre floating bond. <br />As stated before, this site is on an upland terrace deposit with the following characteristics: