Laserfiche WebLink
CC&V has reviewed these minor changes for impacts to the financial warranty calculations. The <br />financial warranty as approved for Amendment No. 9 does not need to be modified. <br />A check in the amount of $1,006 for this technical revision request is attached. <br />Please contact me at (719)-689-4055 should you have questions or wish to discuss this request <br />for a technical revision. <br />Sincerely, <br /> <br />Timm Comer <br />Manager, Environmental Resources <br />xc: Paul Clarkson, Director, Teller County Planning Department <br />Byron Hake, Mayor, City of Victor <br />Enclosed in triplicate: <br />AMEC Drawing No. IA for the ADR Water Pipeline Alignment Plan View <br />AMEC Seepage and Stability Analysis for the ADR Utility Lines <br />AMEC Letter of December 30, 2009 and Drawing No. A355 (Revision 2) for the Closure Drain