Laserfiche WebLink
RELATIVE COMPACTION TEST RESULTS <br />PROJECT: West Elk Refuse Pile <br />PROJECT NO: M09011MT <br />DATE: Wednesday, Nov/25/09 <br />SITE LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />ENGINEERING TECHNICIAN: Hayes <br />NUCLEAR GAUGE USED: 18 <br /> <br /> <br />TEST <br />NO <br /> <br />TEST LOCATION <br />DEPTH OR <br />ELEVATION <br />PROBE <br />DEPTH <br />IN LABORATORY <br />PROCTOR <br />DENSITY <br />PCF OPTIMUM <br />MOISTURE <br />CONTENT <br />% <br />DRY <br />DENSITY <br />PCF <br />MOISTURE <br />CONTENT <br />RELATIVE <br />COMPACTION <br />SOIL TYPE <br />890 RPE-01 6220.49 8 77.0 15.5 82.7 10.3 100 Coal Gob, Black <br />891 RPE-02 6221.27 8 77.0 15.5 78.8 12.6 100 " <br />892 RPE-03 6221.19 8 77.0 15.5 77.4 13.1 100 " <br />893 RPE-04 6220.91 8 77.0 15.5 79.5 9.3 100 " <br />894 RPE-05 6220.01 8 77.0 15.5 <br />i 80.2 12.4 100 " <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />Tmu-&Jert anb xlriz 1 PROJECT NUMBER: M0901IMT