Laserfiche WebLink
Uwe m4ol A444c;-evi <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />PROJECT NAME: West Elk Refuse Pile Expansion PROJECT NUMBER: M09011MT <br />CLIENT: Mountain Coal Company <br />PROJECT LOCATION: Somerset <br />SAMPLE DESCRIPTION: Coal Gob, Black <br />DATE: Oct/2/09 <br />SAMPLE NO: 1614 <br />SOURCE: Composite of locations at elevations <br />6211.54 to 6218.15 at Refuse Pile <br />Expansion <br />NATURAL MOISTURE CONTENT <br />TEST HOLE MOISTURE <br />CONTENT (%) <br />RPE 01 11.7 <br />RPE 02 10.9 <br />RPE 03 14.2 <br />RPE 04 14.7 <br />RPE 05 11.3 <br />RPE 06 17.0 <br />RPE 07 12.9 <br />RPE 08 14.4 <br />RPE 09 14.5 <br />RPE 10 8.0 <br />RPE 11 12.2 <br />RPE 12 11.5 <br />RPE 13 11.7 <br />RPE 14 12.2